BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work and paving for a road / highway in Cherry Hills Village, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 4th, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000408682 Project Location: E. Quincy Avenue East and West Bound Lanes Starting at S. Holly on the east and ending at S. Clarkson on the west (See attached Aerial for specific location) Summary of Work Description: The work shall consist of rehabilitating the surface layer of existing asphalt pavement. Rehabilitation shall be accomplished with specially designed equipment in a simultaneous multistep process of heating, scarifying, applying an asphalt recycling agent, thoroughly remixing and reshaping the old asphalt, and applying a new layer of HMA conforming to the project specifications in compliance with lines, grades, thickness and typical cross sections of the existing roadway. The work will be completed utilizing Section 405 Heating and Repaving Treatment of the Colorado Department of Transportation (CDOT) Specification Book, as modified by the Specifications in Exhibit F of this document. The contractor will be required to provide all traffic control (flaggers, signage, cones, ultra panels, etc.) throughout the entire project. The City of Cherry Hills Village does not recognize traffic control or mobilization, re-mobilization, or de-mobilization as a separate line item. In addition, the contractor will need to provide third-party material testing related to all material specs and compaction. The City is specifying an asphaltic mix design for this project to be a (Grading SX) (75) PG 58 - 28. The City will allow up to a twenty percent (20%) reclaimed asphalt pavement (RAP) in its mix design. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 10 % Each Bid shall be made on the Form of Bid provided in the bid packet and no Bidder may withdraw his Bid for a period of ninety (90) days from and after the date set for opening of bids. Each Bid must be accompanied, in a sealed envelope, by a Bid Bond on an approved form in an amount equal to ten percent (10%) of the Bid price, made payable to the City of Cherry Hills Village, which shall be considered as liquidated damages and shall be forfeited to the City if said Bid is accepted and the Bidder fails to execute the Contract Documents section within ten (10) calendar days after the Award by the City The successful Bidder will be required to furnish, as part of the Contract, insurance certificates in the amount specified in the General Conditions, a Performance, Payment, Maintenance and Warranty Bond in an amount equal to one-hundred percent (100%) of the Contract Sum, said bond to be issued by a responsible corporate surety approved by the City, and which shall guarantee the faithful performance of the Construction Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Question Deadline 02/06/2026 at 2:00 PM MT Questions are submitted online Yes The City reserves the right to waive informalities or irregularities and to reject any or all Bids. Capitalized terms have the meaning assigned in the General Conditions.

Bid Results

Roads / Highways

$636,851.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
2
Bidding Soon
970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 16, 2026

Project location map

E Quincy Ave, Cherry Hills Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.