BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 21, 2026

Demolition, site work and paving for a bridge / tunnel in Cartersville, Georgia. Completed plans call for the demolition of a bridge / tunnel.

Bartow County will accept sealed bids for the rehabilitation of two existing bridges located on Cassville White Road. The project consists of rehabilitating two undersized bridges with substandard widths near the I-75 Interchange, by replacing the superstructures only with a proprietary Sandwich Plate System (SPS) superstructure tied to new wide flange beams. The substructure of the easternmost bridge will require minor modifications including new wing walls and caps on all four corners. Additional work includes minor ancillary road and pavement construction such as guardrails, markings, signage, debris removal, and additional pavement widths for approximately 250 feet on both sides of both bridges. The work must be completed within a 92-day summer timeline upon receipt of a Notice to Proceed. Each bid must include a Bid Bond of 5% of the bid amount. Both a Performance Bond (100% of contract price) and a Payment Bond (110% of the Performance Bond) are required. Proof of General Liability and Worker's Compensation Insurance is required with Bartow County as an additional insured. Bidders must be prequalified contractors or registered subcontractors with GDOT. All contractors and subcontractors must comply with nondiscrimination, legal employment verification, and supply chain requirements as specified. All required affidavits and forms must be submitted with the bid. Submission instructions specify that all blanks on the Proposal must be correctly filled for each Pay Item, and calculations must adhere to the stated rules. Bids may not be withdrawn for 60 days after opening. Bartow County reserves the right to reject any or all bids and waive technicalities or informalities. The work shall be completed within the May 1-July 31 timeline. The successful bidder must meet the summer timeline of 92 days to complete the work upon receipt of a Notice to Proceed to Construction from the Project Sponsor Question Deadline 01/28/2026 at 5:00 PM ET All questions concerning this RFB must be submitted in writing to amoss@bartowcountyga.gov. No questions other than written will be accepted. No response other than written will be binding upon the County.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, Paving, Site Work

26

6

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
1
Bidding Soon
1,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

May 1, 2026

Project location map

Cassville White Rd, Cartersville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.