BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Site work for a water / sewer project in Plattsburgh, New York. Completed plans call for site work for a water / sewer project.

The purpose of this project is to conduct a study that determines the impact of upcoming and future developments on the City's combined sewer system on Rugar Street, and to provide guidance on necessary infrastructure upgrades needed to handle increased waste, particularly identifying limiting segments within the sewershed and potential effects on CSO 007 by SUNY. The scope of work includes: evaluating the Rugar Street sewershed to accommodate current and future sewer flows from the Town of Plattsburgh to the City WRRF (including the Route 3/Broad Street entry that joins Rugar sewershed downstream of CSO 007); identifying limiting sewer segments; evaluating CSO 007 to understand its physical set up, determine the ongoing need for its outfall and regulator, and evaluate the storm sewer surcharge theory; identifying possible corrective actions with associated cost estimates; and performing a preliminary design of any selected action. All work is funded by NBRC and must comply with its requirements.

Bid Results

Water / Sewer

$85,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
647
Active Projects
362
Bidding Soon
2,842
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

March 22, 2026

Project location map

Rugar Street, Plattsburgh, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.