Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Demolition, site work, paving and new construction of a mixed-use development in Chippewa Falls, Wisconsin. Completed plans call for the demolition of a water / sewer project; for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; water / sewer project; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
In general, the work consists of: replacing the existing sanitary sewer lift station for the DHS Northern Wisconsin Center in Chippewa Falls, Wisconsin. Site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Event bid date notes :Hand delivery to the drop box labeled sealed bids only in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
GC Bidding
Water / Sewer
$630,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
March 27, 2026
2820 E Park Ave, Chippewa Falls, WI
Related To This Project
Chippewa Falls, WI
Bid Date: Jan 27 2026
Chippewa Falls, WI
Bid Date: Dec 18 2025
Chippewa Falls, WI
Bid Date: Dec 04 2025
Chippewa Falls, WI
Bid Date: Dec 09 2025
Chippewa Falls, WI
Bid Date: Nov 06 2025
Chippewa Falls, WI
Bid Date: Oct 30 2025
Chippewa Falls, WI
Bid Date: Oct 16 2025
Chippewa Falls, WI
Bid Date: Oct 09 2025
Chippewa Falls, WI
Bid Date: Oct 23 2025
Chippewa Falls, WI
Bid Date: Sep 04 2025
Chippewa Falls, WI
Bid Date: Aug 14 2025
Chippewa Falls, WI
--
Chippewa Falls, WI
Bid Date: Jun 16 2025
Chippewa Falls, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
