Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 30, 2026 at 7:00 PM
Updated January 31, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Bonners Ferry, Idaho. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the construction of a bridge / tunnel.
Project Description Bridge Key No. 20730 Westside Drive over Parker Creek, Boundary County Existing Bridge Key Number 20730 is in Boundary County and carries Westside Drive over Parker Creek. The bridge is owned and maintained by Boundary County and is located approximately 23.8 miles north of Bonners Ferry, ID. This proposal is for the contractor to remove the existing timber bridge replace it with a single span pre-stressed concrete girder bridge with reinforced concrete abutments. The road will be closed during construction and traffic will be detoured. Additional work includes roadway approach construction and permitted stream alterations including placing riprap Work will not start earlier than March 1St, 2026, or later than ,June 15th, 2026 and must be completed within 100 working days. All in-water work must be completed between July 1st, 2026 and September 30th, 2026. The project does not require a DBE goal
Bid Results
Bridges / Tunnels
$1,148,552.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
March 1, 2026
West Side Rd, Bonners Ferry, ID
Related To This Project
Bonners Ferry, ID
--
Bonners Ferry, ID
Bid Date: Jan 29 2026
Bonners Ferry, ID
Bid Date: Nov 04 2025
Bonners Ferry, ID
Bid Date: Oct 03 2025
Bonners Ferry, ID
Bid Date: Oct 08 2025
Bonners Ferry, ID
--
Bonners Ferry, ID
Bid Date: Jul 11 2025
Bonners Ferry, ID
Bid Date: Oct 03 2025
Bonners Ferry, ID
Bid Date: Apr 03 2025
Bonners Ferry, ID
Bid Date: Apr 09 2025
Bonners Ferry, ID
Bid Date: Apr 03 2025
Bonners Ferry, ID
--
Bonners Ferry, ID
--
Bonners Ferry, ID
--
Bonners Ferry, ID
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
