BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a mixed-use development in Carrollton, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Improvement limits are within the Whitlock Addition subdivision in the City of Carrollton. Improvement streets include E Russell Avenue, Norris Street, Ryan Avenue, Homer Street, associated alleys, and parking lot improvements at WJ Thomas Park. The project consists of barricades and traffic control, removal, disposal, and replacement of approximately 22,000 square yards of street pavement, construction of approximately 5,000 SY of sidewalks, water and sewer adjustments, and 2,000 LF of storm pipe. Question Deadline 02/04/2026 at 5:00 PM CT Questions may be submitted via online. An Addendum addressing the questions received will be issued no later than Friday, February 6, 2026 at 11:00 AM This project will generally include all construction, labor, materials, testing, services, administration, and associated activities required in conjunction with or properly incidental necessary for the following: 1. Improvement limits are within the Whitlock Addition subdivision in the City of Carrollton. Improvements streets include Noble Avenue, E Alan Avenue, Norris Street, Homer Street, Faye Avenue, and associated alleys. 2. Replacement of existing 16,000 SY of street pavement 3. Construction of approximately 37,000 SF of sidewalks. 4. Construction of approximately 475 SF of retaining wall. 5. Construction of 531 LF of storm pipe. The Work of Project is defined by the Contract Documents and generally consists of but not limited to the following: 1. Demolition existing road pavement in the project scope. 2. Replacement of existing neighborhood roadway including pavement, curb in the project scope. 3. Construction of approximately 37,000 SF of sidewalk, pedestrian ramps shall be in accordance with the City of Carrollton General Design Standard and the Texas Accessibility Standards. 4. No irrigation design will be included in the project. 5. Replacement of existing street pavement striping and signs. All pavement striping and signs shall be in accordance with the City of Carrollton General Design Standard. 6. Protect existing residence retaining walls and fences. 7. Earthwork to include clearing & grubbing. 8. Various site and infrastructure improvements and restoration incidental to primary project construction. 9. Traffic control 10. Erosion control 11. Tree removal

GC Bidding

Roads / Highways

$8,560,614.00

Public - City

Paving, Site Work

160

16

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
234
Bidding Soon
3,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

March 2, 2026

Project location map

Multiple Locations, Carrollton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.