BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work for a water / sewer project in Bayside, Wisconsin. Completed plans call for site work for a water / sewer project.

The work consists of installing 33 sanitary lateral and lead service replacements. The Contractor is responsible for all required construction staking, which is considered incidental to the contract. The Contractor must notify the Owner when starting each portion of work, and project inspection will be provided by the Owner or their designee. The Owner and Engineer have full authority and discretionary power to issue verbal or written instructions to the Contractor throughout the progress of the work, and to accept or reject any work or materials not in accordance with the intent of the plans and specifications. All work, including replacement and restoration, must be completed by October 30, 2026, with substantial completion defined as all work, including restoration, being ready for final walkthrough to identify punchlist items, and achieved within 75 calendar days from the start of work, excluding resident coordination work. The Contractor is responsible for verifying utility locations and coordination, and must contact all relevant utilities at least three full business days prior to starting construction. The Contractor is also responsible for utility protection and coordination with other contractors or utility owners on site. Bid security is required and proof of responsibility per Wisconsin Statute 66.0901 must be shown. Bids will only be accepted from prequalified Bidders. All bid documents must be obtained from the designated source and original copies used for submission. Subcontractors and Contractors must be on the list of approved contractors as specified. Failure to submit required qualification information within the indicated times may disqualify a Bidder from contract award. The Contractor shall provide, install, and maintain a traffic control plan and is responsible for all roadway maintenance in the work areas. All safety devices must conform to the Manual on Uniform Traffic Control Devices. Access for local and emergency traffic must be maintained, and at least one lane of traffic must remain open at all times. The Contractor must also furnish a Warranty Bond covering the work for three years from final acceptance, guaranteeing correction of any defects or failures during the warranty period at no additional cost to the Owner. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Question Deadline 01/20/2026

Award

Water / Sewer

$1,146,483.00

Public - City

Site Work

3

99

5

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
2
Bidding Soon
1,234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

March 30, 2026

Project location map

Multiple Locations, Bayside, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.