BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2026 at 7:00 PM

Updated January 31, 2026

Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.

The City of Phoenix is seeking a qualified contractor to provide preconstruction services and complete construction services for the Union Hills Water Treatment Plant - Finished Water Improvements Construction Manager at Risk (CMAR) project. This project will involve the construction of a new 20 Million Gallon (MG) Reservoir at the Union Hills Water Treatment Plant, rehabilitation of the existing 40 MG reservoir, and improvements associated with bringing the new reservoir into service. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The City of Phoenix has identified the need to improve the long-term operational and drought resiliency of finished water operations at the Union Hills Water Treatment Plant. The existing 40 million gallon (MG) finished water reservoir requires rehabilitation but cannot be taken out of service without significantly affecting plant operations. A new 20 MG on-site concrete reservoir will be designed and constructed to provide redundancy for the plant's finished water storage, allowing the existing reservoir to remain offline longer for rehabilitation and future maintenance. The improvements will also facilitate greater operational flexibility in the event of significant reductions in available Colorado River water resources. The project includes, but is not limited to, the new 20 MG reservoir, rehabilitation of the existing 40 MG reservoir, reconstruction and improvements to the existing raw water impoundment, site improvements such as grading, drainage, utility design, and improvements to access and circulation needed to support the connection and operation of the new facilities. Note that the rehabilitation design for the existing 40 MG reservoir is on-going under a separate contract. Question Deadline 01/23/2026 at 4:00 PM MT Questions pertaining to this selection process or contract issues should be submitted via onlien. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, ** pre bid info : https://teams.microsoft.com/l/meetup-join/19%3ameeting_Yjg3YTc4M2ItMDMxMC00ZTY3LWIyMDktNTY3YWQzYjFiYzli%40thread.v2/0context=%7b%22Tid%22%3a%2296b9695c-4f0e-42bd-8adf-ba755760346b%22%2c%22Oid%22%3a%227f93f5de-3ef6-42e1-9049-da4e5b377784%22%7d

Post-Bid

Water / Sewer

$15,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
1
Bidding Soon
621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

January 1, 2027

Project location map

2001 E Deer Valley Dr, Phoenix, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.