BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a road / highway in Lyndhurst, New Jersey. Completed plans call for site work for a road / highway.

Route 17, CR 130 (Orient Way) to Route 80 and Route 120, CR 503 (To & From Sports Camp) to Route 17 (11th Street), Contract No. 003253740, ATS Signal Improvements, Lyndhurst Township, Rutherford Borough, East Rutherford Borough, Carlstadt Borough, Wood-Ridge Borough and Hasbrouck Heights Borough-Bergen County CE No: 0212511 CONTROL SECTION 0212101 Work Types are eligible to bid this project: 33, or 7 The Principal Items of Work Consist of: Roadway Quantity Unit Description 2,204 Lf Fiber Optic Cable Type E 11 U Ctss Controller 11 U Controller, Ctss Turn on 16 U Wireless Links, Point to Point 1 Ls Communications Integration Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 138 - ATS Signal Improvements - Various Locations After Award of Contract. North Region Mr. Nart Appesh, Regional Construction Engineer 200 Stierli Court Mt. Arlington, NJ 07856-1322 Telephone: 973-810-9078 Question Deadline 02/10/2026 at 12:00 PM ET

Sub-Bidding

Roads / Highways

$2,500,000.00

Public - State/Provincial

Site Work

1

3

36

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,210
Active Projects
605
Bidding Soon
6,790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 20, 2026

Project location map

Multiple Locations, Lyndhurst, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.