Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 20, 2026 at 7:00 PM
Updated January 21, 2026
Renovation of a detention facility in Black River Falls, Wisconsin. Completed plans call for the renovation of a detention facility.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General 27 prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: removal of asphalt roofing from the existing 29,995 square foot main facility building, with installation of new rigid insulation, wood blocking, sheathing, fully covered by ice dam membrane, and standing-seam metal roofing. Existing skylights will be removed, and the openings filled to match the existing decking. Gutters and downspouts will be added to limited areas to interscept excess precipitation runoff near doors and access points. Snow guards will be installed to prevent damage to gutters, and limit snow cascades from one roof surface to another. The 3,627 square foot maintenance building will have an overlay of rigid insulation, wood blocking, sheathing, fully covered by ice dam membrane, and standing-seam metal roofing. The 808 square foot picnic shelter will have all roofing panels removed and new panels installed, anchored to existing wood structure. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Base Bid will be received for: A single lump sum bid for All Work. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The application of the 5% permissive bidding preference pursuant to Wis. Stat. 16.855(10m)(am)3. for certified minority businesses is currently paused. Event bid date notes : Hand delivery to the drop box labeled sealed bids only in front of the state of wisconsin administration building located at 101 east wilson street, madison, wisconsin 53703.
Sub-Bidding
Jails / Prisons
$1,763,000.00
Public - State/Provincial
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
April 5, 2026
W6898 Bartos Road, Black River Falls, WI
Related To This Project
Black River Falls, WI
--
Black River Falls, WI
Bid Date: Feb 27 2026
Black River Falls, WI
Bid Date: Jan 08 2026
Black River Falls, WI
--
Black River Falls, WI
--
Black River Falls, WI
Bid Date: Dec 18 2025
Black River Falls, WI
Bid Date: Dec 15 2025
Black River Falls, WI
Bid Date: Oct 24 2025
Black River Falls, WI
Bid Date: Sep 23 2025
Black River Falls, WI
Bid Date: Aug 12 2025
Black River Falls, WI
Bid Date: Aug 07 2025
Black River Falls, WI
--
Black River Falls, WI
--
Black River Falls, WI
--
Black River Falls, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
