BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a sidewalk / parking lot in Boise, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications. Contractor shall provide all materials, equipment, labor, and supervision necessary to construct a new surface asphalt parking lot with all subsurface storm drainage infrastructure, sidewalks/curbing, electrical, and finished landscaping. The Work shall be in strict accordance with the contract Drawings and Specifications. The contractor shall provide all supervision, labor, equipment, and materials necessary to construct a new parking lot on the parade grounds of the Boise VA Medical Center. Work includes completing all construction services as defined in the Scope of Work, Specifications, and Drawings for BVAMC Project No. 531-22-103, titled Add Parking on Parade Grounds. The project requires full execution of all tasks needed to install the new parking area in accordance with the VA's requirements and the documents provided in the solicitation. Location: Boise VA Medical Center, 500 W Fort St, Boise, ID 83702 The magnitude of this project is between $500,000 and $1,000,000 QUESTIONS: Requests for Information (RFI) must be submitted by email to melissa.howard2@va.gov and stephen.slaby@va.gov by 12:00PM MST on 2/25/2026. RFI(s) submitted after this date will not be considered unless substantially relevant, as determined by the Contracting Officer (CO): Stephen Slaby, Stephen.slaby@va.gov; Alt POC: melissa.howard2@va.gov The Contractor shall begin performance within 10 calendar days and complete it within 182 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$621,843.00

Public - Federal

Paving, Site Work

24

19

2

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
28
Bidding Soon
392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

April 15, 2026

Project location map

500 W Fort St, Boise, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.