Site work and paving for a sidewalk / parking lot in Boise, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications. Contractor shall provide all materials, equipment, labor, and supervision necessary to construct a new surface asphalt parking lot with all subsurface storm drainage infrastructure, sidewalks/curbing, electrical, and finished landscaping. The Work shall be in strict accordance with the contract Drawings and Specifications. The contractor shall provide all supervision, labor, equipment, and materials necessary to construct a new parking lot on the parade grounds of the Boise VA Medical Center. Work includes completing all construction services as defined in the Scope of Work, Specifications, and Drawings for BVAMC Project No. 531-22-103, titled Add Parking on Parade Grounds. The project requires full execution of all tasks needed to install the new parking area in accordance with the VA's requirements and the documents provided in the solicitation. Location: Boise VA Medical Center, 500 W Fort St, Boise, ID 83702 The magnitude of this project is between $500,000 and $1,000,000 QUESTIONS: Requests for Information (RFI) must be submitted by email to melissa.howard2@va.gov and stephen.slaby@va.gov by 12:00PM MST on 2/25/2026. RFI(s) submitted after this date will not be considered unless substantially relevant, as determined by the Contracting Officer (CO): Stephen Slaby, Stephen.slaby@va.gov; Alt POC: melissa.howard2@va.gov The Contractor shall begin performance within 10 calendar days and complete it within 182 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Sidewalks / Parking Lot
$621,843.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 16, 2026
April 15, 2026
500 W Fort St, Boise, ID
Related To This Project
Boise, ID
Bid Date: Mar 13 2026
Boise, ID
Bid Date: Mar 17 2026
Boise, ID
Bid Date: Mar 18 2026
Boise, ID
Bid Date: Mar 11 2026
Boise, ID
Bid Date: Mar 26 2026
Boise, ID
Bid Date: Feb 26 2026
Boise, ID
Bid Date: Mar 09 2026
Boise, ID
Bid Date: Mar 13 2026
Boise, ID
--
Boise, ID
Bid Date: Mar 04 2026
Boise, ID
Bid Date: Mar 10 2026
Boise, ID
Bid Date: Apr 10 2026
Boise, ID
Bid Date: Mar 06 2026
Boise, ID
Bid Date: Mar 09 2026
Boise, ID
Bid Date: Mar 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.