BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a detention facility in Nampa, Idaho. Completed plans call for the renovation of a detention facility.

Exterior and interior painting at the existing Juvenile Correctional Facility A description of the Work of this project can be summarized to include: The work for DPW Project No 26530 IDJC - JCC Nampa Exterior Paint/Seal consists of exterior and interior painting at the existing Juvenile Correctional Facility in Nampa, Idaho. Exterior Work includes selective repair of the existing Exterior Insulation and Finish System (EIFS) and repainting of all exterior EIFS and CMU wall surfaces in their entirety, including the backsides of parapets and the basketball courtyard, as well as repainting of exterior doors, door frames, steel window frames, and exposed steel conduit as noted. Interior Work includes repainting of general wall surfaces and hollow metal door frames within the Administrative and Information Technology suites. The Project also includes an Alternate for the repainting of the Mini Gym. Estimated Cost: $251,300.00 Question Deadline 03/27/2026 Questions concerning a bid must be directed in writing to the designated Design Professional (architect or engineer) no less than ten (10) calendar days before bids

Award

Jails / Prisons

$132,358.00

Public - State/Provincial

Renovation

13

11

11

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

1650 11th Ave N, Nampa, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.