Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a detention facility in Nampa, Idaho. Completed plans call for the renovation of a detention facility.
Exterior and interior painting at the existing Juvenile Correctional Facility A description of the Work of this project can be summarized to include: The work for DPW Project No 26530 IDJC - JCC Nampa Exterior Paint/Seal consists of exterior and interior painting at the existing Juvenile Correctional Facility in Nampa, Idaho. Exterior Work includes selective repair of the existing Exterior Insulation and Finish System (EIFS) and repainting of all exterior EIFS and CMU wall surfaces in their entirety, including the backsides of parapets and the basketball courtyard, as well as repainting of exterior doors, door frames, steel window frames, and exposed steel conduit as noted. Interior Work includes repainting of general wall surfaces and hollow metal door frames within the Administrative and Information Technology suites. The Project also includes an Alternate for the repainting of the Mini Gym. Estimated Cost: $251,300.00 Question Deadline 03/27/2026 Questions concerning a bid must be directed in writing to the designated Design Professional (architect or engineer) no less than ten (10) calendar days before bids
Award
Jails / Prisons
$132,358.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2026
May 8, 2026
1650 11th Ave N, Nampa, ID
Related To This Project
Nampa, ID
Bid Date: Mar 10 2026
Nampa, ID
Bid Date: Mar 12 2026
Nampa, ID
--
Nampa, ID
Bid Date: Mar 31 2026
Nampa, ID
Bid Date: Apr 15 2026
Nampa, ID
Bid Date: Apr 01 2026
Nampa, ID
Bid Date: Apr 16 2026
Nampa, ID
Bid Date: Mar 10 2026
Nampa, ID
--
Nampa, ID
--
Nampa, ID
Bid Date: Feb 12 2026
Nampa, ID
Bid Date: Jan 27 2026
Nampa, ID
Bid Date: Feb 11 2026
Nampa, ID
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
