BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated February 6, 2026

Renovation of an educational facility in Stillwater, Minnesota. Completed plans call for the renovation of a educational facility.

All bids shall be on a lump sum basis. No bid may be withdrawn for a period of 60 days after bid receipt without consent of the Owner. Each bidder shall accompany the Bid Form with a bid security as described in the Instructions to Bidders. The Owner reserves the right to reject any or all bids and to waive any irregularities in bids. The project scope includes, but is not limited to, comprehensive architectural and electrical security upgrades across multiple locations. Architectural improvements include the replacement of existing glass with new security laminated glazing. The electrical scope includes the installation of new security cameras, along with blue light strobe systems. Direct communications regarding this Project to the office of the Construction Manager: Elden Serrato (Elden.Serrato@krausanderson.com) Kraus-Anderson Construction, 501 South 8th Street, Minneapolis, MN 55404 Cell: 612-716-0691 Bidders are also invited to review the results online

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
175
Bidding Soon
1,658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

May 25, 2026

Project location map

To be determined, Stillwater, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.