BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Hayward, California. Completed plans call for site work for a water / sewer project.

Sealed bids are invited for the Burke Sewer Lateral Replacement project, as described in the contract documents, drawings, and specifications prepared by the architect. The scope includes all work necessary for the sewer lateral replacement at Burke Academy. Bidders must comply with all requirements for contractor licensing, CUPCCAA registration, and prevailing wage laws. Work must start no later than a specified start date and be completed by the contract deadline. Bids will only be accepted from contractors who attend the mandatory pre-bid walk at the project site. All bids must be sealed, accompanied by the required bid security, and submitted by the indicated deadline. The successful bidder must provide payment and performance bonds and may substitute securities or establish escrow in lieu of retainage as detailed in the contract. Contractors must maintain the required license, and public works contractor registration numbers must be stated for all relevant subcontractors. Bidders must monitor the designated website for addenda and comply with all specified instructions regarding bid submission and contract performance. SITE ADDRESS WILLIAM P. BURKE ACADEMY 612 WEST A STREET HAYWARD, CA 94541 The project is estimated at $90,000. Q/A:- The deadline for submitting any questions/clarifications to the District is February 2, 2026 by 2 PM. All RFIs are to be emailed to Charity Hastings @ chastings@acoe.org. Sewer Lateral Replacement Replace approximately 110 LF of 6-inch sanitary sewer lateral using the pipe-bursting method with butt-fused HDPE (High-Density Polyethylene). (Ref: Sanitary Sewer Note #7; C2.1 pipe callout) Excavate at both ends of the sewer lateral to verify horizontal and vertical alignment prior to pipe-bursting. Reconnect the new HDPE sewer lateral to the existing sewer main within A Street. Reconnect the new sewer lateral to the existing building sewer service line. Install one (1) new 6-inch cleanout in the same location as the existing cleanout. Verify all dimensions, elevations, utility crossings, general notes, keynotes, sanitary sewer notes, and referenced information throughout the plan set prior to quoting and construction.

Award

Water / Sewer

$83,359.00

Public - County

Site Work

5

3

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
208
Bidding Soon
3,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

April 30, 2026

Project location map

612 W A St, Hayward, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.