BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Demolition, site work and new construction of a mixed-use development in Oakland, California. Completed plans call for the construction of a educational facility; two-story above grade, 16-room educational facility; and educational facility.

This is the Final Bid effort for Coliseum College Preparatory Academy (CCPA). Overaa was awarded a Progressive Design Build (PDB) contract with Oakland Unified School District for this referenced project. Final proposals are requested from all trades involved in the work. The project design has been submitted to the Division of State Architect (DSA) for review. There are two separate increments: an early Site Package and a larger Building Package, which also includes sitework that will occur later in the schedule. Pricing should reflect the current design, criteria required in the RFP, District Standards, and comprehensive solutions that provide for a complete and compliant project. Constructability input, value engineering, identification of long lead materials for early procurement, and other relevant input are also requested. Scope of Work: Construction of a new two-story classroom building with 14 standard classrooms and 2 science classrooms, a new gymnasium, demolition of the existing gymnasium, and construction of an outdoor plaza. Instructions to Bidders: LBE and SLBE Oakland participation is encouraged, with a 50% Local Business participation requirement for all District Capital Program construction and related professional services agreements (25% or less LBE participation AND 25% or more SLBE/SLRBE participation). Oakland-based firms must be certified by recognized agencies. Disabled Veteran Business Enterprise (DVBE) participation is encouraged. All contractors and subcontractors must agree to be bound by the Project Labor Agreement. Contractors subject to SB 854 must register and renew annually with the California Department of Industrial Relations. Skilled and trained workforce requirements apply. All bidders must complete Overaa's prequalification process. MEP Contractors must also be prequalified with OUSD. ESTIMATED COST OF THE PROJECT: The Board of Education approved construction budget is $56M for the entire Project.

Post-Bid

Educational

$56,000,000.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
199
Bidding Soon
2,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 20, 2026

Project location map

1390 66th Avenue, Oakland, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.