Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 6, 2026
Renovation of a fire / police facility in Oakland, California. Completed plans call for the renovation of a fire / police facility.
Q&A: 01/29/2026 2:00 p.m. Questions regarding this IFB must be submitted. Bidders must submit their questions via e-mail to Michael.Dean@dot.ca.gov .Written questions must include: the individual's name, firm name, e-mail address and must reference IFB No. 04A7440. Contractor agrees to provide to the California Department of Transportation (Caltrans) Fire Alarm Control Panel Upgrades as described herein. Contractor shall provide all labor, tools, equipment, material, parts, supplies, permits, travel and incidentals necessary to upgrade existing Fire Alarm Control Panel (FACP) digital alarm communication system from Plain Old Telephone Service (POTS) copper landlines to Cellular by installing a Cellular Alarm Communicator for the San Francisco Oakland Bay Bridge Maintenance Complex Fire Life Safety (FLS) system. A. Contractor shall upgrade existing FACP digital alarm communication system from POTS copper landlines to cellular communicator system. Contractor shall install a new Cellular Alarm Communicator and program to existing FLS system that utilizes Siemens software and equipment. The digital alarm communicator system must meet the minimum specifications and guidelines listed on Caltrans IT Hardware & Software Standards. B. The service provider shall be an authorized programmer on the Desigo systems, and the technician assigned shall be certified to work on Siemens Desigo systems. C. Contractor shall field and verify signal cellular dialer signal strength via NAPCO testing tool. D. Contractor shall provide all labor, tools, equipment, material, parts, and supplies to install the following: 1) One (1) NAPCO StarLink Cellular unit. 2) One (1) dual input module to FACP for supervision of status of NAPCO unit. E. Contractor shall test initiating device (one of each type) to ensure proper reporting once NAPCO device has been installed. F. Contractor shall spot test the FLS system for the purpose of proper reporting of alarm, trouble, and supervisory signals to Siemens Central Station. G. Contractor shall test a sample of the smoke detectors, pull stations, waterflow switches, and control valves with a tamper switch. H. Contractor shall provide engineered design submittal plans to Oakland Fire Department. I. Contractor shall submit the design package to City of Oakland for permit approval. J. Contractor shall be responsible for any permit fees, Authority Having Jurisdiction (AHJ) review, and final acceptance testing with AHJ K. Contractor shall program cellular communicator to the existing Siemens FLS system to communicate fire event signal. L. Contractor shall route necessary wire and install necessary junction boxes to facilitate the above scope of work (for the cellular dialer only-no additional installation labor or materials will be required should there not be sufficient cellular reception in the current dialer room). M. Contractor shall provide services to repair, patch, and/or paint any walls or ceiling grid necessary due to installation and/or testing. N. Service shall not be complete until installation or repair has been made, tested by Contractor and approved to work by Caltrans Contract Manager. O. Contractor shall maintain a complete file for all services performed under this Agreement. This file shall be made available at Caltrans Contract Manager request. As required by Executive Order S-02-06, the California Department of Transportation (Caltrans) is committed to meeting the State's twenty-five percent (25%) Small Business (SB) participation goal. Certified SBs, Micro Businesses (MB), SBs for the purpose of Public Works (SB-PW) are encouraged to submit bid
Post-Bid
Fire / Police
$500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 5, 2026
200 Burma Rd, Oakland, CA
Related To This Project
Oakland, CA
Bid Date: Mar 09 2026
Oakland, CA
Bid Date: Jan 31 2026
Oakland, CA
Bid Date: Feb 25 2026
Oakland, CA
Bid Date: Feb 26 2026
Oakland, CA
Bid Date: Feb 06 2026
Oakland, CA
Bid Date: Feb 12 2026
Oakland, CA
Bid Date: Feb 12 2026
Oakland, CA
Bid Date: Feb 12 2026
Oakland, CA
Bid Date: Feb 19 2026
Oakland, CA
Bid Date: Feb 12 2026
Oakland, CA
Bid Date: Feb 10 2026
Oakland, CA
Bid Date: Feb 24 2026
Oakland, CA
Bid Date: Feb 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
