BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a road / highway in Oakland, California. Completed plans call for site work for a road / highway.

**As of April 20th, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** The Metropolitan Transportation Commission (MTC) is seeking proposals for Sign Maintenance for the I-880 Integrated Corridor Management North Segment project ("Project"). The I-880 Integrated Corridor Management North Segment project has installed intelligent transportation system (ITS) equipment on arterial streets along the I-880 Corridor in the City of Oakland. The Project has installed 43 trailblazer signs including: o 34 electronic signs in City of Oakland right-of-way o 9 electronic signs in Caltrans right-of-way The Contractor shall be responsible for maintenance of the 43 electronic signs and all the required incidental work as outlined in the RFP scope of work. Question Deadline 02/18/2026 at 4:00 PM PT Deadline to submit Questions Online. The purpose of the I-880 North Segment Integrated Corridor Management (ICM) Project ("Project") is to manage traffic that naturally diverts from the freeway due to incidents on I-880. This Project has installed Intelligent Transportation System (ITS) equipment on arterial streets along the I-880 Corridor in the cities of Oakland and San Leandro. This Project extends for approximately nine (9) miles between the I-880/I-980 interchange in the north and the I-880/Davis Street interchange in the south within the cities of Oakland and San Leandro, including the parallel arterials of 12th Street, International Boulevard (SR 185), San Leandro Boulevard/Street and East 14th Street along with the crossing arterials of 23rd Avenue, 29th Avenue, Fruitvale Avenue, 42nd Avenue (SR 77), High Street, 66th Avenue, Hegenberger Road, 98th Avenue, Doolittle Drive (SR 66), and Davis Street (SR 112). Project components include trailblazer signs (TBS) which are devices that are located at critical decision points along local arterial street routes to efficiently guide traffic that has left the freeway along a dedicated route past an incident. The TBS are full-color LED changeable message signs measuring approximately 3' wide by 4.5' tall, as seen in Figure 1. The TBS are mounted 11 feet high on 14-foot posts. MTC SAFE expects the work to commence on or about July 1, 2026, and to be completed no later than June 30, 2027.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Site Work

3

12

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
188
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

July 1, 2026

Project location map

Multiple Locations, Oakland, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.