BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Site work and new construction of a water / sewer project in Santa Ana Pueblo, New Mexico. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Pueblo of Santa Ana is soliciting bids from qualified contractors for the construction of the Well No. 5 Arsenic Treatment System Project. This project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades. All contractors must comply with applicable federal, state, and local regulations, including the Davis-Bacon Act labor standards.

Award

Water / Sewer

$2,000,000.00

Public - Federal

New Construction, Site Work

57

28

16

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
13
Bidding Soon
186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 30, 2026

Project location map

Multiple Locations, Santa Ana Pueblo, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.