BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Renovation of an educational facility in Pomona, California. Working plans call for the renovation of a educational facility.

Reference Number 0000421300 Bid Intent Not Available The project Scope of Work included in this Contract is generally described as follows. This project entails a thorough renovation of Rooms 112 and 113, the designated science laboratories at Garey High School. The renovation aims to ensure compliance with fire life safety standards and accessibility regulations. - Complete demolition of existing cabinets and flooring. - Construction of new steel stud walls. - Three new electrical panels. - Installation of water and gas lines with centrally located emergency services shut-off valves. - Provision of a new fume hood, chemical safety shower, and deionized water stations. - Installation of three monitors in each room, equipped with individualized learning experiences. - Setup of new audio-visual (AV) and Intermediate Distribution Frame (IDF) racks in the adjacent hallway. The Contract Time is 242 consecutive calendar days. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Question Deadline 05/05/2026 at 12:00 PM PT All questions or comments regarding this bid (except to inquire about the number of addenda issued) must be put submitted using the link above. You will receive an email confirmation from Google upon successful submission of Request for Information (RFI). If you encounter problems submitting RFI's using the link, please contact Mina Young at 909 397 4800 ext. 23901.

Final Planning

Educational

$2,128,000.00

Public - City

Renovation

37

25

12

6

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
232
Bidding Soon
4,136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

November 21, 2026

Project location map

321 W Lexington Ave, Pomona, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.