Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 10, 2026

Site work and paving for a mixed-use development in Greenville, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Question Deadline 09/25/2026 All inquiries concerning the plans and proposal for this project are to be directed to: Kyle Piccard Project Manager - Projects & Contracts Engineer All inquiries must be made by E-mail through the electronic proposal system at MILogin for Third Party's. To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. This work consists of preparing all lawns and slopes on non-freeway projects designated for slope restoration on the plans or as directed by the Engineer and applying topsoil , fertilizer, seed, mulch with mulch anchor, mulch blanket, high velocity mulch blanket, permanent turf reinforcement mat, bonded fiber matrix, or modified mulch blanket to those areas. Ensure turf establishment is in accordance with section 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer. 2.09 mi of hot mix asphalt cold milling and single course resurfacing, joint repairs, concrete sidewalk ramp grades and pavement markings on M-91 from the Flat River northerly to Peck Road in the city of Greenville, Montcalm County. Required SBP Participation: 3.00% Net Classification Required For This Project: ** 1602 Cb ** In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N3. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2610 020 - Hot Mix Asphalt Cold Milling and Single Course Resurfacing, Joint Repairs, Concrete Sidewalk Ramp Grades and Pavement Markings on M-91

Bid Results

Roads / Highways

$1,844,455.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
56
Bidding Soon
1,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2026

June 7, 2027

Project location map

M-91, Greenville, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed