BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work for a water / sewer project in Rocky Mount, North Carolina. Working plans call for site work for a water / sewer project.

**As of March 13, 2026, bids received were rejected as they were over the budget. Project will be rebid but no definite date yet.** The City of Rocky Mount and Water Resources Department is seeking responses from qualified licensed utility contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off and ground saturation into the sewer collection system. The City of Rocky Mount and Water Resources Department is seeking responses from qualified licensed utility contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off and ground saturation into the sewer collection system. The Contractor shall be licensed and bonded in North Carolina and shall use sufficient workmen and competent supervisors in the execution of this portion of the work to ensure adequate and proper installation throughout. This specification references standards from the American Society for Testing and Materials, such as: ASTM F1216 (Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube), ASTM F1743 (Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)), ASTM D5813 (Cured-in-Place Thermosetting Resin Sewer Pipe), ASTM D790 (Test Methods for Flexural Properties of Un-reinforced and Reinforced Plastics and Electrical Insulating Materials), and D2990 (Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics) which are made a part hereof by such reference and shall be the latest edition and revision thereof. In case of conflicting requirements between this specification and these referenced documents, this specification will govern Question Deadline 01/27/2026 Provide Response to Questions Thursday 1/29/2026 Written questions shall be e-mailed to tracy.winfield@rockymountnc.gov by the date and time specified in the proposal schedule. Contractors will enter "RFP #320-210825TW - Questions" as the subject for the email Manhole, Wet Well, Infiltration, and Corrosion Protection System Part 1 - General 1.1 Section Includes A. This Section covers the infiltration and corrosion protection system for sanitary sewer manholes, where indicated on the Contract Drawings. The manhole lining system shall provide a monolithic multi-layer/component lining and cover the entire chimney, walls, and benches of the manholes to provide infiltration and corrosion protection as a total system. Work includes, but is not limited to, the following: 1. Manhole cleaning of sedimentation and debris. 2. The removal of any loose and unsound material. 3. Performing surface preparation for the lining application. 4. Applying patching products. 5. Manhole Lining. 1.2 Submittals A. Submit product data for each component specified including data substantiating that the proposed materials comply with specified requirements and recommendations by the manufacturer cover all materials. B. Submit technical data, and Safety Data Sheet (SDS) on each product used. C. Submit manufacturer's literature or specifications including surface preparation, application information, curing period, and testing. D. Submit copies of independent testing performed on the coating product including ASTM G210- 13 and ASTM D543 indicating the product meets the requirements as specified herein. E. Submit technical data sheet and project specific data for repair materials to be top coated with the coating products including application, cure time and surface preparation procedures. F. Samples of the cured system to include the following: 1. Finish material. 2. Stepped samples showing stages of multi-layer/component applications. The Contractor shall be licensed and bonded in North Carolina and shall use sufficient workmen and competent supervisors in the execution of this portion of the work to ensure adequate and proper installation throughout.

Final Planning

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
9
Bidding Soon
1,150
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

September 14, 2026

Project location map

Multiple Locations, Rocky Mount, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.