BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 11, 2026

Site work for a service station / car wash facility in Greeley, Colorado. Completed plans call for site work for a service station / car wash facility.

Reference Number 0000409921 Weld County is seeking bids for a vendor to provide Wash Bay Concrete Repairs. Question Deadline 02/10/2026 at 10:00 AM MT Questions are submitted online No . Questions email: bids@weld.gov . Bids open -By Phone +1 720-439-5261,,930465450# United States, Denver Phone conference ID: 930 465 450# The scope of this project is for construction management and general contracting services per this invitation for bid and attachments which include the project drawings to demolish the designated concrete slabs and trench drains, regrade below slab, and pour in new concrete slabs / trenches for Weld County's Wash Bay. o Demolition o Concrete Flat Work o Concrete Reinforcing o Steel Embeds These above items are represented in Attachment 1 - Project Drawings. All scopes indicated in attachment 1 are to be included in this contractor bid. 1. The Contractor will be required to remove and reinstall minor automatic washing equipment to allow for demo and installation of new slab / trenches. 2. Contractor to provide two weeks' notice for wash bay shutdowns. 3. Contractor to provide expansion where applicable and Sikaflex-1c SL at all joints. 4. Contractor to provide all concrete reinforcing per the project documents. 5. Contractor is responsible for all private and public locates for the entirety of this project. 6. Contractor is responsible for maintaining existing site conditions including all areas that are not disturbed during the construction process. 7. Contract is responsible for protecting all manual and automatic wash bay equipment throughout the entirety of the project. It will be the contractor's responsibility to have an equipment representative onsite to perform a test and calibration prior to substantial completion. 8. All submittals will need to be provided to the County project manager for review and approval no later than thirty (30) days after contract execution. 9. Any additional work or scope that may result in changes must be submitted to the County project manager in writing and approved before any work is to be started. If the contractor does not submit in writing and receives written approval but starts any additional work, the contractor will be responsible for all associated cost and or schedule impacts/delays. 10.Any clarification or information needed from the contractor must be submitted through an RFI for response. It is the contractor's responsibility for tracking and maintaining all RFI's. An RFI log must be maintained and kept by the contractor and available for review at the weekly coordination meeting or upon request. 11.Contractor is responsible for all material handling and deliveries. Weld County will not accept any deliveries made to the building. The contractor will use the work area(s) for any onsite storage that may be needed. 12.The contractor will provide a full-time superintendent or project manager on site while any work is being performed. 13.The contractor is responsible for all daily cleanup and ensuring that all materials or equipment have been properly stored in the designated areas at the end of each shift to ensure normal building operations are not interrupted. If at any time Weld County personnel or contractors have to clean or move materials or equipment that were not properly stored the contractor will assume all associated costs. 14.Contractor is responsible for coordination for all site utilities. Weld County will pay all applicable plant investment fees. 15.Contractor is responsible for coordination with Weld County building department and the local city and fire municipalities. 16.Contractor must submit daily logs or project updates to the Weld County project manager on a weekly basis at a minimum. 17.All work can be completed during normal business hours, unless it requires any electrical, mechanical, or plumbing system to be shut down. If so that work must be completed during off hours. All systems must be functional before the start of the next business day. 18.Normal business hours are Monday through Friday from 7:00 am to 5:00 pm. 19.Contractor is responsible for maintaining dust control at all times so as to not disturb the normal operations of the building. All temporary walls and or partitions are the responsibility of the contractor. 20.Contractor is responsible for coordinating the final location of all electrical and data outlets prior to installation of rough in boxes with the Weld County project manager and IT representative. 21.Contractor is responsible for maintaining existing building conditions. At no time is the building to be without power, mechanical systems, and plumbing systems. 22.Contractor to provide Schedule 80 bollards throughout the project. Weld County to specify paint color in the submittal process.

Sub-Bidding

Service Station / Car Wash

$200,000.00

Public - County

Site Work

11

5

2

6

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
142
Bidding Soon
1,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

1399 N 17th Ave, Greeley, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.