Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2026 at 7:00 PM
Updated February 26, 2026
Site work for an educational facility in Columbia, Missouri. Completed plans call for site work for a educational facility.
Questions regarding the scope of work should be directed to Jason Hunter with PRVN Consultants, Inc. at (319)430-2496 or jhunter@prvninc.com. Questions regarding commercial conditions should be directed to Greg Hayes at (573) 884-7788 or ghayes@missouri.edu. CONSTRUCTION ESTIMATE: $1,928,284 - $2,142,538 The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on the Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of, but is not limited to, o Construction of new steam manhole SMH-737. o Structural refurbishment of existing steam chase from utility tunnel to SMH-737 to SMH-105. o Structural refurbishment of existing steam chase from SMH-105 to SMH-100. o Structural refurbishment of existing steam chase from SMH-100 to Stephens Hall. o Structural refurbishment of existing steam chase from SMH-737 to Schweitzer Hall. o Structural refurbishment of SMH-100. o Structural refurbishment of SMH-105. o Demolition of steam and condensate piping and supports in chases, SMH-100, and SMH-105. o New steam and condensate piping, valves, anchors, and supports in chases, SMH-100, SMH-105, and SMH-737. o Pavement removal and replacement. o New water service, including open cut and directional boring installation. o Utility relocations to facilitate construction of new steam manhole. o Insulation of steam and condensate utilities in the chases, buildings, SMH-100, SMH-105, and SMH-737. o Electrical work in steam manholes. o Site lighting removal and replacement. o Asbestos abatement of chase and SMH waterproofing, and chase and SMH piping insulation. (2) Demolition consists of, but is not limited to, site clearing, partial demolition of structures, fencing, paving, demolition of steam and condensate utilities, and obstructions as required to complete the work. (3) Civil work consists of, but is not limited to, earthwork, shoring, fencing, traffic control, pedestrian control, paving, and water utilities as required to complete the work. 4) Structural work consists of, but is not limited to, concrete, metals, and waterproofing as required to complete the work. (5) Mechanical work consists of, but is not limited to, steam piping, condensate piping, storm drain piping, fittings, valves, expansion joints, supports, anchors, specialties, and miscellaneous items as required to complete the work. (6) Electrical work consists of, but is not limited to, site lighting and manhole electrical services. 4. LOCATION a. Work shall be performed under this Contract on the campus of the University of Missouri - Columbia near the Stephens Hall, Schweitzer Hall, Waters Hall, and Lefevre Hall *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Educational
$2,033,700.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
May 25, 2026
503 S College Ave, Columbia, MO
Related To This Project
Columbia, MO
Bid Date: Feb 20 2026
Columbia, MO
Bid Date: Feb 04 2026
Columbia, MO
Bid Date: Feb 02 2026
Columbia, MO
Bid Date: Feb 09 2026
Columbia, MO
Bid Date: Feb 17 2026
Columbia, MO
Bid Date: Feb 18 2026
Columbia, MO
Bid Date: Feb 17 2026
Columbia, MO
Bid Date: Feb 20 2026
Columbia, MO
Bid Date: Feb 05 2026
Columbia, MO
Bid Date: Jan 30 2026
Columbia, MO
Bid Date: Jan 29 2026
Columbia, MO
Bid Date: Jan 28 2026
Columbia, MO
Bid Date: Jan 28 2026
Columbia, MO
Bid Date: Feb 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
