BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Renovation of an educational facility in Monterey, California. Completed plans call for the renovation of a educational facility.

Removing and replacing EMS systems as shown in drawings and specifications provided by Cypress Engineering Group in the following location(s): Art Ceramics, Art Studio, Auto Tech, Facilities & Physical Sciences. License Requirements C-20 Q&A Deadline 02/13/2026 2:00 PM (PST) : Online Q&A : Yes Bidders may submit pre-bid inquiries or clarification requests. Bidders are solely and exclusively responsible for submitting such inquiries or clarification requests by Friday, The District will not respond to any bidder inquiries or clarification requests, unless such inquiries or clarification requests are submitted timely through the Planet Bids Q & A portal. 980 FREMONT STREET, MONTEREY, CA REMOVE (E) EMS CONTROLLERS, SENSORS, ACTUATORS AND WIRING. (E) EQUIPMENT TO REMAIN. TURN OVER DEMOLISHED ACTUATORS AND SENSORS TO OWNER. 2. PROVIDE NEW EMS CONTROLLERS, SENSORS, VALVE AND DAMPER ACTUATORS, THERMOSTATS AND WIRING. IF WIRING IS DETERMINED TO BE ABLE TO BE REUSED, PROVIDE A CREDIT TO OWNER FOR WIRING. 3. PROGRAM CONTROLLERS TO SPECIFIED SEQUENCE OF OPERATION. 4. PROVIDE NEW EMS FRONT-END AND GRAPHICS. 5. UPON COMPLETION OF CONSTRUCTION CALIBRATE VAV TERMINAL UNIT AIRFLOW RATE TO MATCH AIRFLOW SHOWN ON DRAWINGS. 6. ASSIST OWNER'S COMMISSIONING AGENT IN VALIDATING THE OPERATION OF THE NEW CONTROLS SYSTEM. The Monterey Peninsula College, BMS Phase 2 project consists of removing and replacing EMS systems as shown in drawings and specifications provided by Cypress Engineering Group in the following location(s): a. Art Ceramics b. Art Studio c. Auto Tech d. Facilities e. Physical Sciences 2. The Contractor shall be responsible for scheduling and coordinating the work with the MPC Staff, Representatives, and contractors on other MPC projects working concurrent with this project. Reference paragraph 1.04 of this section. 3. The work to be done includes all labor, tools and equipment necessary to furnish and install all materials and equipment shown on the drawings and described herein and to perform tests described herein, to provide complete and operating systems to the extent specified and shown on the drawings. The Contractor shall furnish all equipment, material and supplies, except where specifically noted as existing or supplied by the District.

GC Bidding

Educational

$600,000.00

Public - City

Renovation

35

23

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
76
Bidding Soon
1,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

980 Fremont St, Monterey, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.