BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Demolition and renovation of a multi-residential development in Harper, Kansas. Completed plans call for the renovation of a multi-residential development; and for the demolition of a multi-residential development.

Housing Rehabilitation Projects 515 E. 7th – Awarded to Skyline Construction in the amount of $26,375. 611 E. 8th – Awarded to ABBA Construction in the amount of $24,025. Demolition Projects 607 E. Main – Awarded to ABBA Construction in the amount of $24,000, contingent upon verification of required KDHE asbestos certifications. If certification requirements are not met, demolition will be awarded to Wilsons Dig & Flow ($20,200) with asbestos removal awarded to iSi Industrial ($10,400). 201 E. 11th – Awarded to Wilsons Dig & Flow in the amount of $11,245. 215 E. 11th – Awarded to Skidsteer Services in the amount of $6,000, and asbestos removal awarded to iSi Industrial in the amount of $4,680. The project involves Rehabilitation on the properties located at 515 E 7th and 611 E 8th, as well as Demolition at 215 E 11th, 607 E Main, and 201 E 11th. This is part of the CDBG Home Rehabilitation Project to enhance the safety and wellbeing of the community. Bidders must attend a mandatory pre-bid meeting and sign the attendance sheet; bids from non-attendees will be considered non-responsive. Sealed bids must be submitted by the stated deadline and may be submitted digitally via a secure Box link upon request. A detailed listing of all subcontractors must be provided, and documentation that the contractor and subcontractors meet minimum qualifications is required. The owner reserves the right to waive informalities or reject any or all bids. Equal opportunity and non-discrimination policies apply, and participation by small, minority-owned, and womens business enterprises is encouraged. No bid withdrawals are allowed within 60 days after the bid opening. Special Requirements: A MANDATORY Pre-Bid Meeting: February 4, 2026, at 11:00 a.m. Demolition bidding will commence at 3:15 PM. Please see the schedule included in this packet The full schedule for bidding is listed below for your convenience. Time Property Address 11:00 AM 515 E 7th, Harper 11:30 AM 611 E 8th, Harper 12:00-12:30 Break for travel 12:30 PM 502 S Springfield, Anthony 1:00 PM 502 S Lincoln, Anthony 1:30 PM 120 S Springfield, Anthony 2:00 PM DEMO: 124 S Springfield, Anthony 2:30 PM DEMO: 411 E Washington, Anthony 3:15 PM DEMO: 215 E 11, Harper 3:45 PM DEMO: 201 E 11, Harper 4:15 PM DEMO: 607 E Main, Harper Bid Result 607 E Main - Wilsons Dig & Flow - 20200 201 E 11th - Wilsons Dig & Flow - 11245 215 E 11th - Skidsteer Services - 6000 515 E 7th - Skyline - 26375 611 E 8th - ABBA - 24025

Award

Multi-Residential

$87,845.00

Public - City

Demolition, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

Multiple Locations, Harper, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.