Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 15, 2026 at 7:00 PM
Updated February 17, 2026
Renovation of a playground / park / athletic field in Tooele, Utah. Completed plans call for the renovation of a playground / park / athletic field.
Tooele County Parks and Recreation is soliciting bids from qualified vendors for the design, fabrication, delivery, and installation of a custom walk-in combination refrigerator/freezer unit, or a commercially available unit that meets the specifications contained in the RFP and Attachment A: Scope of Work. The unit will be used for commercial food storage and must meet all applicable health, safety, and building code requirements. Documents related to this bid are hosted on another electronic bidding service and require registration to download. Tooele County Parks and Recreation is soliciting bids from qualified vendors for the design, fabrication, delivery, and installation of a custom walk-in combination refrigerator/freezer unit, or a delivery and installation of a commercially available unit that meets the specifications contained in this document. The unit will be used for commercial food storage and must meet all applicable health, safety, and building code requirements Question Deadline 02/01/2026 at 11:30 PM MT Online Portal The project consists of one (1) combined walk-in unit configured as approximately: o 70% freezer o 30% refrigerator The refrigerator and freezer compartments shall be fully separated, each with its own access door. 3. Space and Dimensional Requirements The completed walk-in unit must fit within the following maximum available space: o Width: 13 feet 4 inches (13'-4") o Depth: 8 feet 0 inches (8'-0") o Height: Vendor to propose standard height compatible with site conditions Vendors are responsible for verifying all field dimensions prior to fabrication. No deviation from maximum footprint dimensions will be accepted without prior written approval. 4. Construction Requirements o Walk-in panels shall be commercial-grade insulated panels suitable for freezer and refrigerator applications. o Exterior finish: Stainless steel on all exterior-facing surfaces. o Interior finish shall be food-safe, non-corrosive, and compliant with local health department requirements. o Panels shall include appropriate vapor barriers and insulation values suitable for freezer operation. 5. Compartment Configuration o The unit shall be divided internally into: o One (1) Freezer compartment (~70% of total interior space) o One (1) Refrigerator compartment (~30% of total interior space) o Compartments must be fully sealed from one another. 6. Doors o Two (2) total doors, consisting of: o One (1) freezer door o One (1) refrigerator door o Doors shall be: o Self-closing o Equipped with safety release mechanisms o Insulated and gasketed for energy efficiency o Door swing direction(s) to be coordinated with Owner prior to installation. 7. Refrigeration System o Condenser units shall be top-mounted. o Separate refrigeration systems for freezer and refrigerator are preferred unless otherwise approved. o Systems must be: o Energy-efficient o Appropriately sized for the compartment volumes o Rated for continuous commercial operation o Refrigerants must comply with all current EPA and environmental regulations. 8. Electrical Requirements o Vendor shall provide complete electrical specifications with the bid. o Electrical connection point to be coordinated with Owner. o All equipment must comply with applicable electrical codes. 9. Installation Vendor shall provide delivery and complete installation, including: o Assembly of panels o Installation of refrigeration systems o Startup and operational testing o Installation/wiring of any necessary electrical outlets/connections o Installation must be performed by qualified technicians and is subject to inspection by Tooele County before acceptance and contract completion. 10. Codes and Standards All equipment and installation shall comply with: o Local and state building codes o Health department requirements o NSF, UL, and/or ETL standards as applicable o OSHA safety requirements 11. Submittals Bids must include: o Detailed specifications and cut sheets o Shop drawings showing layout and dimensions o Electrical requirements o Warranty information o Lead time for fabrication and installation o Itemized pricing
Post-Bid
Playgrounds / Parks / Athletic Fields
$100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed