BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2026 at 7:00 PM

Updated February 24, 2026

Site work and paving for a road / highway in Tooele, Utah. Completed plans call for site work for a 901,137-square-foot road / highway.

Tooele County invites qualified and experienced contractors to submit bids for the County's 2026 AP4 Roadway Treatment Project. The project involves the application of AP4 asphalt polymer surface treatment to 901,137 square feet of roadways within the County as specified in attached maps. The selected contractor will be responsible for providing all necessary labor, materials, and equipment to complete the AP4 application in accordance with The Latest Edition of the APWA, MUTCD and project specifications. Please see project details in attached solicitation documents. Tooele County invites qualified and experienced contractors to submit bids for the 2026 AP4 Contract. The project involves the application of AP4 asphalt polymer surface treatment to roadways within the County as specified in attached maps. The selected contractor will be responsible for providing all necessary labor, materials, and equipment to complete the AP4 application in accordance with The Latest Edition of the APWA, MUTCD and project specifications. Scope of Work: 1. Preparation: Inspect and clean the designated roadways to ensure they are free of debris, vegetation and loose materials. Implement traffic control measures per MUTCD requirements to ensure the safety of workers and the public during construction. Provide 48 hour written notice to each resident impacted by project road closure The project is expected to commence on May 1st, 2026, and be completed by June 26th, 2026. The County is flexible if the vendor chooses to start the project earlier (weather permitting). All questions shall be sent through the Bonfire/U3P website. All questions shall be submitted before February 19, 2026, at 12:00pm MST Questions should be submitted through utah.bonfirehub.com. For issues submitting through the portal, please contact Daniel Folks at daniel.folks@tooeleco.gov. AP4 is an asphalt preservation treatment system carefully applied after the pavement is washed clean. AP4 is applied through specialty equipment capable of pre-wetting the pavement and utilizing autonomous rate control. AP4 is a high-performance, high-density, emulsion-based asphalt polymer surface treatment. It consists of cutting-edge polymers for added durability and resistance to ultraviolet rays, oxidation, water, and chemicals. AP4 incorporates industry leading aggregates, providing unmatched mix stability, size gradation, hardness, mineralogy, and chemical compatibility. These characteristics result in unparalleled friction and longevity of the fixative film and AP4 is always manufactured and applied at a minimum of 58% residual solids

Post-Bid

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

May 1, 2026

Project location map

To be determined, Tooele, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.