Published March 19, 2026 at 8:00 PM
Updated March 20, 2026
Site work and new construction of a water / sewer project in Palmyra, Wisconsin. Completed plans call for the construction of a 1,512-square-foot water / sewer project.
Construction of a Water Treatment Plant (WTP) to house granular activated carbon water treatment equipment to treat PFAS-impacted water from existing Wells #1 and #3 in the Village of Palmyra, WI. The WTP consists of a new 54-foot x 28-foot building with cast-in-place concrete foundation floors, two-wythe concrete masonry and cut stone walls and insulation, steel standing seam roof, wood fascia and soffit with metal covers and trim, wood sheathing and gypsum board ceiling; FRP and hollow metal doors and frames; louvers; aluminum windows; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; mechanical piping, valves, flowmeters, and appurtenances. Water Treatment Equipment includes two 12-foot diameter x 24-foot (approx.) tall granular activated carbon (GAC) adsorption vessels each containing approximately 1,330 cubic feet of GAC; pre-manufactured pipe/valve skid; and one new liquid chemical feed system. Site work includes horizontal directional drilling (HDD) of 8-inch PVC from Wellhouse #1 to the new WTP; 8-inch diameter PVC C900 water main and valves; 1-1/2-inch diameter copper water service to the WTP; hydrant; 1-inch copper water service to Wellhouse #1; 12-inch and 6-inch diameter drain piping; 30,000-gallon nominal capacity buried precast concrete detention tank; submersible waste pump; HDPE low pressure sewer main with connection to new sanitary sewer; PVC C900 gravity sewer main; two sanitary manholes; 12-inch apron endwall, one storm manhole, three storm inlets, 12-inch RCP storm sewer; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. 15% participation for MBE/WBE utilization Each proposal must be accompanied by a certified check or bid bond equal to at least 5% of the bid amount, payable to the Owner as a guarantee that if accepted, the bidder will execute and file the proper contract and bond within 15 days after award. No bid may be withdrawn within 60 days of opening. Minimum wages must be paid according to Federal Davis Bacon Wage Rates. The project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program funding, and a good faith effort must be made to achieve a combined minimum goal of 15% participation for MBE/WBE utilization. Requirements related to the "Build America, Buy America" act apply to all iron, steel, manufactured products, and construction materials used in the project. The Owner reserves the right to waive or reject any or all bids. Question Deadline 02/19/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions . Andrew Rockweiler, PE, (608) 355-8877 | arockweiler@msa-ps.com Questions received less than seven days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$4,979,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2026
April 27, 2026
Multiple Locations, Palmyra, WI
Related To This Project
Palmyra, WI
Bid Date: Mar 03 2026
Palmyra, WI
Bid Date: Aug 29 2024
Palmyra, WI
--
Palmyra, WI
Bid Date: Aug 17 2023
Palmyra, WI
Bid Date: Jul 10 2023
Palmyra, WI
Bid Date: Jul 06 2023
Palmyra, WI
Bid Date: Jun 20 2023
Palmyra, WI
Bid Date: Jan 19 2023
Palmyra, WI
Bid Date: Jun 26 2023
Palmyra, WI
Bid Date: Jan 19 2023
Palmyra, WI
Bid Date: Jan 19 2023
Palmyra, WI
Bid Date: Apr 05 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.