BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and new construction of a mixed-use development in Houston, Texas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

It is the intention of the Spring Independent School District to select a Construction Manager At-Risk (CMAR) through a two-step Request for Qualifications (RFQ) process for the construction of the District's Multi-Campus Electrical Project. Individuals or entities submitting Statements of Qualifications and, if qualified, Price Proposals are referred to as Offerors. To view the full specifications and submit a proposal, registration as a vendor within the online system and login are required. Question Cuttoff Date & Time 1/22/2026 12:00:00 PM (CT) This is a multi-campus electrical renovation project. _ EMA is the engineer on record and overseeing design, and Frank Sanchez is their PM. _ Ion Wave is the electronic sourcing site that is used to house the bid. Meaning, this platform is where you will receive notification of the bid, submit your proposal, and your references. _ The bid information was posted on Friday, January 16th, if you do not have an account with Ion wave, contact our office, and we can assist with getting you set-up. _ We have broken this project down into three different groups, based on the electrical renovation needs. The quantities needed will be detailed on the plans o Electrical Service Renovations - Meyer ES, and Hirsch ES. This project consists of repair work to the awnings that lead to entry points at the campuses. o Lighting Renovations - Dekaney HS, Wells MS, and Westfield HS. _ Dekaney HS: interior/exterior lights, parking lot lights, full LED swap out _ Wells MS: interior/exterior lights, parking lot lights, only campus with specialty lights as we will integrate the exterior lighting to building controls _ Westfield HS: interior/exterior lights, parking lot lights, lighting at the football field and tennis court complex, replace equipment with general wear and tear, and relocate the controls for the stadium and tennis courts to prevent student access o Power Factor Detection and Submetering - design an overall efficient system to help with the function of the campus, we are still working to confirm the list of these campuses.

Sub-Bidding

Educational

$2,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
245
Bidding Soon
3,368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.