Published March 7, 2026 at 7:00 PM

Updated March 8, 2026

Site work for a power facility in Spanish Fork, Utah. Completed plans call for site work for a power facility.

The work required under this project will construct the Argyle Substation Site Fill at the Spanish Fork City Argyle Substation as detailed in the plans and specifications. Contractor furnished materials and labor will be used on the project. The successful contractor will be required to perform and participate in all aspects of the fill placement process, such as material purchase, installation and testing as outlined in the drawings and specifications. Close coordination between the Contractor, the Owner, the Engineer and other Vendors (such as material suppliers) will be required in order for the fill to be placed successfully and on schedule. The work zone will be kept in an orderly manner and cleaned daily. The work zone will be watered and or swept as needed, or at the Citys request, to control dust or debris. A self-propelled street sweeping broom shall be kept on site at all times. Contractor shall be responsible to secure work zone during construction to prevent unauthorized vehicular access. Site Work for Future Substation. Question Deadline 02/06/2026 at 3:00 PM MT

Award

Power Plant

$67,885.00

Public - City

Site Work

4

10

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
82
Bidding Soon
949
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

March 6, 2026

Project location map

200 W 100 S, Spanish Fork, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.