BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a playground / park / athletic field in Eau Claire, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

The work consists of site work including general demolition and excavation, removal of one volleyball court, clearing and grubbing of natural turf, and removal of multiple trees. New site work includes topsoil, seeding, and general erosion control. New pavement pedestrian walkways. New basketball and pickleball court work includes installation of a sand base, post tension concrete pavement, court surfacing and striping, and basketball hoops. New volleyball court work includes installation of a dense graded base, 18-inch deep silica sand, volleyball nets, posts, and lines. New court lighting will be installed for all courts and connected to the campus electrical infrastructure. The MEP Subcontractor scope of work is identical to the General Prime Contractor scope of work included in these bidding and contract documents. By submitting and signing a bid, all bidders have examined all of the Bidding Documents listed in the Table of Contents of the project specifications. The successful bidders will be required to do all work which is shown on the drawings, mentioned in the specifications, or reasonably implied as necessary to complete the division of work bid for this project

Post-Bid

Playgrounds / Parks / Athletic Fields

$875,000.00

Public - State/Provincial

Site Work

16

19

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
1,005
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

630 Hilltop Cir, Eau Claire, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.