BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Riverside, California. Completed plans call for the renovation of a educational facility.

Contractor is responsible for completion of all work associated with the roofing project at Mira Loma Middle School. This project includes all necessary labor, tools, materials, and equipment to accomplish the work shown in the bid documents. The class of California contractors license required to bid on and perform the contract for this Project is: C-39. Contractor must be an authorized installer of Tremco Roofing and Building Maintenance. All bids must be submitted on District bid forms only. Each bid must be submitted with security in an amount not less than ten percent (10%) of the maximum bid amount as a guarantee that the bidder will enter into the proposed contract, including all required Contract Documents. The successful bidder will be required to provide both a performance bond and a separate payment bond, each in an amount equal to 100% of the total contract amount. Bidders must pay not less than the general prevailing rates of per-diem wages for each craft or type of worker needed to execute the contract. All contractors and subcontractors must be registered with the Department of Industrial Relations to perform public work and maintain active registrations for the duration of the Project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Estimated Bid Value - $1.6M - $1.9M REQUESTS FOR INFORMATION: May be submitted to Lindsey Hopson, Senior Buyer, via e-mail at lindsey_hopson@jusd.k12.ca.us, no later than Tuesday, February 10, 2026, at 2:00 p.m. Tentative Board Approval Date: March 10, 2026 (subject to change) This project consists of reroofing all buildings at Mira Loma Middle School. All asphalt shingles to be removed and replaced with new and all flat roof and HVAC wells to be coated per the attached roof analysis.

Award

Educational

$1,527,000.00

Public - County

Renovation

4

10

10

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
653
Active Projects
346
Bidding Soon
4,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 20, 2026

Project location map

5051 Steve Ave, Riverside, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.