BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work and paving for a mixed-use development in Pewaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; road / highway; and for paving for a road / highway.

Project involves approximately 17,500 S.Y. full depth pavement milling, 5,400 tons asphaltic concrete pavement, 3,250 L.F. concrete curb and gutter replacement, sanitary structure repairs, water valve repairs, water service curb box replacements, storm sewer CIPP lining, storm sewer replacement and restoration including topsoil, seed, fertilizer and erosion mat. All Work is included in a single prime contract. Construction time is of the essence. Completion delays are subject to liquidated damages. The City of Pewaukee reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. . Work covered by Contract Documents is to be performed under a single prime contract, which includes all sections of Specifications. 1.02 OTHER WORK AT THE SITE (AND NOT IN THIS CONTRACT) A. Work by Owner's employees: 1. Operate existing valves, gates, pumps, equipment, and appurtenances. B. Work through direct contracts with Owner: 1. Construction staking. Follow 01 71 23. 2. Construction review by Resident Project Representative: a. Follow Supplementary Conditions for responsibilities and authority. b. Notify Engineer at least 3 days before starting open cut pipeline excavation Work or before adding an additional pipeline excavation crew. 1.03 WORK RESTRICTIONS A. See Agreement for Contract Times and Milestones. B. For scheduling and progress of Work, conduct operations to not impair operations of Owner's existing facilities. Maintain normal operation of facilities and assume associated special costs due to Work. Pre-qualification: Required. A Bidder's qualification statement must be delivered to the City of Pewaukee at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to the City of Pewaukee equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the City of Pewaukee as liquidated damages. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Plan Holder's of Record. Questions received from Bidders that do not, in Engineer's opinion, allow sufficient time to respond prior to the date for opening of Bids will not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

GC Bidding

Roads / Highways

$1,525,000.00

Public - City

Paving, Site Work

3

18

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
280
Bidding Soon
2,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

June 8, 2026

Project location map

To Be Determined, Pewaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.