BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Renovation of a municipal facility in Cedar Springs, Michigan. Completed plans call for the renovation of a municipal facility.

Reference Number 0000411193 General Requirements - Insurance Required Bid Intent Optional Bid Intent Deadline 02/17/2026 08:30 AM EST Question Deadline 02/12/2026 at 5:00 PM ET Any questions regarding the contract must be sent by email to purchasing@kentcountyroads.net or submitted on our online. Answers to those questions will be shared in the form of an addendum. The Board reserves the right to reject any and all proposals or to waive irregularities therein, and to accept any bids which, in the opinion of the Board, may be most advantageous and to the best interest of the County. Site Location-Kent County Road Commission North Complex 11777 White Creek Ave NE Cedar Springs, MI 49319 Demolition o The contractor shall: o Safe decommissioning in locations of existing direct buried medium voltage loop o Safe removal and disposal of (3) existing pad-mount transformers per environmental codes and standards. Medium Voltage Loop Installation o The contractor shall: o Install a new MV distribution loop per engineered drawings and specifications. o Provide all necessary conduit, cabling, terminations, splicing, grounding, and labeling as required for a code compliant installation. o Ensure loop configuration supports redundancy, load balancing, and future expansion (as applicable). o Perform continuity testing, insulation testing, and MV system commissioning. o Acquire permits as required for project. o Raceway & Cabling Specs: o 4" HDPE Conduit o 15kV Cabling o #2 AWG Cu EPR Cable o 133% Insulation o Cu Tape Shield Transformer Replacements o The contractor shall: o Provide labor, materials, equipment, and disposal services required to replace (3) pad-mount, oil-filled transformers. o Provide new concrete pads as required o Complete primary and secondary connections and terminations o Provide grounding & bonding o Provide grounding system verification o Receive, deliver, and store transformers at their facility as required o Acquire permits as required for project o Transformer Sizes: o 300kVA - 8.32Y/4.8kV to 480Y/277V o 75kVA - 8.32Y/4.8kV to 480Y/277V o 45kVA - 8.32Y/4.8kV to 208Y/120V o Transformer Specs: Maddox Brand - No Alternates o Fluid: Mineral Oil o Temp Rise: 65C o Cooling Class: ONAN o Conductor: Al/Al o Fusing: Bayonet W/Iso Links o Switch: None o Tank Material: Mild Steel o Arrestors: None o Cabinet Depth: Standard o Transformer Features and Accessories: o Liquid Level Gauge o Pressure Vacuum Gauge o Dial-Type Thermometer o Schrader Valve o External Drain @ Sample Valve o Pressure Relief Valve o Padmount Green Paint o UL Listed, Made in America Coordination Requirements o The contractor shall: o Coordinate directly with the electrical contractor installing a new generator when replacing the 300kVA transformer. o Confirm final placement location of the 300kVA transformer o Align on timing, site access, shutdown procedures, energization scheduling. o Ensure all work involving the generator tie-in and MV network changes occur safely and without operational conflicts. o Participate in joint planning meetings as required. C. Project Timeline: Contractors shall provide o Proposed project schedule including key milestones, shutdown windows, and system commissioning date(s). o Contract must be completed by September 30, 2026 o Identification of any lead-time risks for materials or equipment. o Coordination schedule with the generator installation contractor. D. Proposal Requirements: The response to this RFP must include the following three (3) separate documents: 1. Firm Profile and Experience 2. Project Approach 3. Pricing Form (Appendix A) Firm Profile and Experience: This document should include the following: o Firm background. o Evidence of experience with 15kV class MV systems or equivalent. o Proof of successful completion or modification of three or more MV transformer or MV loop installations. o Copies of relevant licenses, safety certifications, and insurance coverage. o Description of team qualifications and roles for this project, including engineering personnel. Project Approach: Proposers shall include the following information demonstrating their understanding of the project and proposed execution strategy: o Detailed project approach and execution plan o Proposed project schedule o Safety plan and job hazard analysis (JHA) o Warranty terms o List of required owner furnished items (if any)

Sub-Bidding

Municipal

$50,000.00

Public - County

Renovation

3

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
168
Bidding Soon
1,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

11777 White Creek Ave NE, Cedar Springs, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.