BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a road / highway in Joliet, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Complexity Factor for this project is 0.035 The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 22, 2026, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase I and Phase II engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies as well as plan preparation and land acquisition studies for the improvement anticipated at the following locations or similar intersections in Will County: US 52 at E. North Street IL 50 (Governors Highway) at County Line Road IL 1 (Dixie Highway) at Eagle Lake Road IL 113 (Main Street) at W River Road US 45 at US 52/Joliet Road US 6 (Southwest Highway) at 187th Street IL 113 (Main Street) at Coal City Road/S Frontage Road The anticipated scope of work consists of intersection improvements to meet 2050 travel demand and address safety concerns. A roundabout alternative will be evaluated at all intersection locations. As part of the Phase II study portion, an evaluation on whether innovative project delivery is feasible for all intersections is expected. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) ILDOT - 20 - RFQ Engineering - Phase II Intersection Improvement Projects

Conceptual

Roads / Highways

$45,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
708
Active Projects
472
Bidding Soon
3,714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2027

Project location map

Multiple Locations, Joliet, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.