BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work for a power facility in Hastings, Nebraska. Completed plans call for site work for a power facility.

Installation of a new motor control center, electrical equipment, instrumentation, raceway, power cables, and controls cables for WEC1 Bottom Ash Hopper Water Recirculation System in Hastings, Nebraska. Bidders must be on the approved bidders list for this project and must fill out the Plan Holders Submittal Form available on the City website. Each bid must include a certified check or bid bond in the amount of not less than five percent (5%) of the total bid, as security. No bid may be withdrawn after opening without city consent for a period of sixty (60) days. Bidders are evaluated on timeliness of prior contracts, existing workload, and available manpower. The successful bidder must furnish a Performance Bond for the full contract amount within ten (10) days of award. No additional time is given to provide the Performance Bond. TECHNICAL QUESTIONS Brandon Miller - Mechanical Engineer 1228 N Denver Ave Hastings, NE 68901 Ph# 402-462-3653 Email: bidquestions@cityofhastings.org GENERAL QUESTIONS OR REQUESTS Renae Griess Engineering Admin Assistant Ph# 402-462-3665 Email: bidquestions@cityofhastings.org

Sub-Bidding

Power Plant

$600,000.00

Public - City

Site Work

28

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

1228 N Denver Avenue, Hastings, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.