Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2026 at 8:00 PM
Updated April 5, 2026
Site work and paving for a civil project in Beaufort, South Carolina. Completed plans call for site work for a water / sewer project; bridge / tunnel; and for paving for a bridge / tunnel.
Project No: BFT-24384 Phase I: Installation of approximately 12,200 linear feet of 16-inch Polyethylene liner inside of an existing 16-inch steel waterline and other related work required for complete installation. Phase II: Installation of approximately 1,625 linear feet of 16-inch fusible PVC installed by horizontal directional drill (HDD) on both sides of Archer Creek Bridge to replace an existing 16-inch waterline suspended from the bridge, and 170 linear feet of 16-inch PVC installed by open cut. Questions Due Date: Feb 19th 2026, 5:00 PM EST Questions must be submitted electronically at: BJWSA Procurement Portal Installation of approximately 12,200 linear feet of 16-inch Polyethylene liner inside of an existing 16-inch steel waterline and other related required for complete installation. bid result Base Bid Option 1 – Insituform Technologies, LLC – $4,219,665.50 Base Bid Option 2 – Insituform Technologies, LLC – $5,136,280.80
Award
Bridges / Tunnels
$6,054,967.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
May 4, 2026
Malecon Dr, Beaufort, SC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
