BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work for a water / sewer project in Comanche, Oklahoma. Completed plans call for site work for a water / sewer project.

This is a bank stabilization project involving erosion control and creek restoration work. Includes mobilization, muck excavation, unclassified borrow placement, riprap installation, filter blanket, sod installation, and traffic control. May require general contractor qualification and mandatory pre-bid conference attendance. Pre-Bid Meeting 02/23/2026 at 10:00 AM CT Bond Percentage 5.00% Cashier's Check, Certified Check, Irrevocable Letter of Credit, or Paper Surety Bid Bond This work shall consist of mobilization of the Contractor's forces and equipment necessary for performing the work required under the contract. It shall include the purchase of contract bonds, transportation of personnel and equipment, payment of all road permits and fees, establishment of office buildings and other necessary facilities, and other preparatory work at the project site. It also includes removal of personnel, equipment, buildings, supplies, etc., from the project site. Seventy percent (70%) of the Mobilization bid price may be paid on the first partial payment and the balance paid on the final payment.

Bid Results

Water / Sewer

$198,200.00

Public - State/Provincial

Site Work

5

5

4

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

Multiple Locations, Comanche, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.