BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Auburn, California. Completed plans call for site work for a bridge / tunnel; playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

In accordance with plans and specifications prepared by Stantec, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of picnic area improvements, site furnishings, trails, paved entry road and parking lot, drainage improvements, boat launch access ramp and gravel parking area, barrier rocks, and signage. Existing improvements to be protected in place include a concrete vault toilet structure, drainage culvert, and picnic sites. The Work will be performed at the following location: Ralston Picnic Area and Sediment Removal Boat Launch (near Ralston Powerhouse), Tahoe National Forest & Eldorado National Forest, Placer County, CA. Question Deadline 03/03/2026 at 2:00 PM PT Written questions regarding the Contract Documents and/or the proposed Work should be sent to Jonathan Boland, GE, Associate Engineer by e-mail only at jboland@pcwa.net . All emails shall require verification of receipt by sender in accordance with the Instructions to Bidders. ** pre bid info : Bids received from Bidders who did not sign the sign-in sheet and attend the meeting and walk-through will be returned to the Bidder unopened. Attendance by subcontractors is not mandatory, but all interested prospective subcontractors are encouraged to attend. The Owner will cause to be transmitted to all recipients of Contract Documents such Addenda as Owner considers necessary in response to questions raised at the meeting and walk-through. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective. Except for mandatory walk-through, no other access to the project site will be granted pre-bid without the Owner's approval. During all site visits the Bidder must be accompanied full time by an authorized representative of the Owner. No exceptions. The estimated cost of construction is $395,000.

Award

Bridges / Tunnels

$449,979.00

Public - County

Paving, Site Work

21

16

2

8

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
169
Bidding Soon
2,235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

April 17, 2026

Project location map

Multiple Locations, Auburn, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.