Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 4, 2026 at 8:00 PM
Updated June 10, 2026
Site work for a service station / car wash facility in Shawnee, Kansas. Completed plans call for site work for a service station / car wash facility.
Scope: • Demo existing fuel island (remove light poles and set aside) • Provided new 4K gallon DW fuel tank for UNLEAD/piping/equipment • Provide new pump for diesel tank to convert to pressurized system • Provide transition sump and underground piping to new fuel island • Provide two (2) new Wayne Select Fuel dispensers/hanging hardware • Upgrade existing Fuelmaster to FMLive • Provide 396 Gal Heated DEF tank and dispenser for fuel island • Provide New fuel island 34’ x 5’ • Provide new canopy with LED lights 34’ x 25’ o Structural design to be done by manufacturer • Provide all new electrical conduit/wiring/emergency stops o Add switched neutral breakers to dispenser circuits. o Add e-stop on side of panel enclosure. o Add shunt breaker to make e-stop work.
GC Bidding
Service Station / Car Wash
$800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
July 15, 2026
18690 Johnson Drive, Shawnee, KS
Related To This Project
Shawnee, KS
Bid Date: Mar 20 2026
Shawnee, KS
Bid Date: Apr 23 2026
Shawnee, KS
--
Shawnee, KS
Bid Date: Apr 23 2026
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
Bid Date: Jul 02 2026
Shawnee, KS
--
Shawnee, KS
Bid Date: Jan 13 2026
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
Bid Date: Nov 26 2025
Shawnee, KS
Bid Date: Nov 13 2025
Shawnee, KS
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
