Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2026 at 7:00 PM
Updated February 12, 2026
Site work and paving for a mixed-use development in State College, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
For the Construction of Shared-use Pathways in Centre County, State College Borough, Commonwealth of Pennsylvania. The Project Being Situated as Follows: Mostly Adjacent to Easterly & Westerly Parkway (Site 1) and Blue Course Drive (Site 2). The Project Length is Approximately 8115 Feet (1.54 Miles). Pathway Construction Includes: Superpave Asphalt Mixture Design for the Base Replacement, Binder, and Wearing Courses, Piping, Inlets, Concrete Curb, Sidewalks, Detectable Warning Surfaces, Concrete Cheek Walls, Pavement Markings, and Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 3.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - State College Shared Use Path, TASA *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Roads / Highways
$2,500,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2026
May 26, 2026
Blue Course Dr & Westerly Pkwy, State College, PA
Related To This Project
State College, PA
Bid Date: Feb 24 2026
State College, PA
--
State College, PA
Bid Date: Feb 24 2026
State College, PA
Bid Date: Feb 26 2026
State College, PA
Bid Date: Feb 17 2026
State College, PA
Bid Date: Feb 17 2026
State College, PA
Bid Date: Feb 19 2026
State College, PA
Bid Date: Feb 24 2026
State College, PA
Bid Date: Mar 03 2026
State College, PA
Bid Date: Mar 03 2026
State College, PA
Bid Date: Feb 10 2026
State College, PA
Bid Date: Jun 18 2021
State College, PA
--
State College, PA
Bid Date: Feb 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
