Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2026 at 7:00 PM
Updated March 5, 2026
Renovation of a clubhouse / community center in Plymouth, Nebraska. Completed plans call for the renovation of a clubhouse / community center.
The project involves updating the HVAC equipment in the Community Center Building. Proposals must be submitted in a sealed envelope. The awarding body reserves the right to reject any or all bids, waive informalities and irregularities, and make awards on bids that furnish the materials and installation. (2)- 10 ton, 11.2 EER/14.8 IEER,Two stage, electric cooling, natural gas heating Roof Top Units (RTU) o (2)- Curb adapters to raise the units up higher per current code requirement. o (2)- Fresh air economizers for fresh air requirement for public buildings and for free cooling during spring, fall and winter cooling demands. o (2)- 3 ton, 13.4 SEER2, single stage air conditioners with matching indoor cased horizontal evaporator coils o (1)- 5 ton, 13.4 SEER2, single stage air conditioner with matching indoor cased horizontal evaporator coil o (2)- 96% AFUE, 2 stage, natural gas furnaces (high fire 60,000 btu, Low fire 45,000 btu) o (1)- 96% AFUE, 2 stage, natural gas furnace (High fire 100,000 btu, Low fire 75,000 btu) o (5)- digital programmable thermostats o (2)- Lockable wire thermostat guards for auditorium area o Supply and return duct modifications and connection to existing duct system o Copper flush kit and connections for split systems o PVC exhaust venting for new furnaces o Removal of existing hanging heaters in the auditorium area. Heating will now be done by the RTU units on the roof o Natural gas piping from hanging heaters to RTU units on the roof. o High and low voltage connections o Condensate drain piping and connections. o Crane rental and rigging for RTU removal and installation o Caps for existing unit heater flue pipes in auditorium. Flue pipes will not be removed from roof. o Standard Installation labor rate o Removal and disposal of existing equipment and materials o Material sales tax
Award
Clubhouse / Community Centers
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2026
March 25, 2026
313 East Main Street, Plymouth, NE
Related To This Project
Plymouth, NE
Bid Date: Jan 12 2026
Plymouth, NE
Bid Date: Jan 12 2026
Plymouth, NE
Bid Date: Apr 02 2025
Plymouth, NE
Bid Date: Jan 08 2024
Plymouth, NE
Bid Date: Jul 26 2023
Plymouth, NE
Bid Date: Jan 10 2023
Omaha, NE
Bid Date: Feb 18 2026
Omaha, NE
Bid Date: Mar 31 2026
McCook, NE
Bid Date: Mar 03 2026
Omaha, NE
Bid Date: Feb 25 2026
Lincoln, NE
Bid Date: Feb 13 2026
Lincoln, NE
Bid Date: Feb 18 2026
Lincoln, NE
Bid Date: Feb 20 2026
Offutt AFB, NE
Bid Date: Mar 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
