BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Renovation of an educational facility in Goose Creek, South Carolina. Completed plans call for the renovation of a educational facility.

he successful contractor of this solicitation shall be responsible to provide all labor, materials, equipment and any other resources to complete HVAC replacement project. Installation shall be coordinated with the District's project manager, contact information shall be provided upon final award. The contractor shall provide performance and payment bond in the full amount of the contract sum, issued by a surety company licensed in South Carolina, with an "A" minimum rating of performance as stated in the most current publication of "best's key rating guide, property liability" which shall show a financial strength rating of at least five (5) times the contract amount. Each bond must be accompanied by a "power of attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the performance bond. Installation must be performed in accordance with the manufacturer's specifications to avoid compromising the manufacturer's warranty. Upon completion of the HVAC replacement systems, all debris must be removed from the site. QUESTIONS MUST BE RECEIVED BY: January 30, 2026 by 5:00 PM See "Questions from Offeror's provision All questions must be submitted to Robin McNeal, via email, at mcnealr@bcsdschools.net prior to the deadline for questions stated herein. Your offer must include either a bid bond issued by a surety or sureties licensed in South Carolina or a certified check. The amount of surety shall be five per cent (5%) of the total bid amount. This bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. If a certified check is submitted in lieu of a bid bond, it must be made payable to the District. THIS IS AN HVAC REPLACEMENT PROJECT AT BOULDER BLUFF ELEMENTARY SCHOOL IN GOOSE CREEK, SOUTH CAROLINA. ALL ROOFTOP UNITS WILL BE REPLACED AND ALMOST ALL OF THE UNITS WILL BE INSTALLED ON THE EXISTING CURBS. THE NEW FAU-1 AND FAU-2 ARE A DIFFERENT FOOTPRINT THAN THE EXISTING FAU-1 AND FAU-2 AND WILL REQUIRE NEW STRUCTURAL SUPPORT UNDERNEATH THE UNITS. ALL OF THE THROUGH WALL HEAT PUMPS AND KITCHEN MAKEUP AIR UNIT WILL BE REPLACED AS WELL.

Award

Educational

$2,470,000.00

Public - County

Renovation

48

12

17

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

June 2, 2026

Project location map

400 Judy Dr, Goose Creek, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.