Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 10, 2026 at 7:00 PM
Updated February 21, 2026
Site work for a water / sewer project in Parowan, Utah. Completed plans call for site work for a water / sewer project.
The project involves sediment removal and restoration for the Parowan City Flood Control Basin. Questions: Dan Jessen at dan@parowan.gov Question Deadline 02/20/2026 at 11:30 AM MT Questions Online Portal 2.1 Scope Intent (Performance-Based) The City intends to engage a contractor to: o Remove approximately 650k to 850k cubic yards of accumulated sediment; o Excavate the basin to a Contractor designed, City-approved final configuration, including side slopes, grades, and geometry suitable for long-term flood control functionality and future maintenance; and o Complete the work within a defined and reasonable timeframe. This RFP is intentionally performance-based. Proposers are encouraged to submit creative, realistic, and executable approaches to accomplishing the work, provided the City's performance requirements are met. The material within the basin consists of: o Predominantly sand and gravel suitable for processing into rip rap, road base, bedding sand, and related products; o Some percentage of less desirable material (e.g., clay, fines, or non-processable material). The City does not guarantee material quality, gradation, or marketability. 3. COMPENSATION STRUCTURE 3.1 Compensation in Kind The City intends to compensate the selected contractor solely through the right to remove, retain, use, or sell the excavated material, subject to the requirements of this RFP. No monetary payment from the City is anticipated. All material removed from the basin becomes the property of the contractor, except as expressly reserved by the City
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
March 23, 2026
To be determined, Parowan, UT
Related To This Project
Parowan, UT
Bid Date: May 18 2020
Parowan, UT
--
Parowan, UT
Bid Date: Nov 18 2025
Parowan, UT
Bid Date: Oct 14 2025
Parowan, UT
Bid Date: Jul 10 2025
Parowan, UT
Bid Date: May 20 2025
Parowan, UT
Bid Date: Apr 25 2025
Parowan, UT
Bid Date: Jan 06 2026
Parowan, UT
Bid Date: Mar 26 2024
Parowan, UT
Bid Date: Apr 22 2021
Parowan, UT
Bid Date: Aug 20 2021
Parowan, UT
Bid Date: Mar 24 2023
Parowan, UT
Bid Date: Mar 14 2023
Parowan, UT
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed