BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work and new construction of a mixed-use development in Penn Wynne, Pennsylvania. Completed plans call for the construction of a library; library; power facility; and power facility.

The base bid work includes, but is not limited to, the installation of carport photovoltaic system, including delegated design, fabrication, and erection of the carport structures; coordination with PECO electric for switchover; and associated site work with restoration. In addition, the project includes the base bid repair of the library's asphalt shingle roof. The add alternate includes, but is not limited to, replacement of the library's asphalt shingle roof (in lieu of base bid repair) with a standing seam metal roof system, including structural reinforcement of the wood rafters, and installation of a roof photovoltaic system. Question Deadline 03/06/2026 at 5:00 PM ET Questions regarding the project scope shall be submitted via the Messages feature in PennBid. The last day for receipt of written questions is end of business day. Sealed proposals are requested for the Penn Wynne Library Photovoltaic System, Contract Number 26-06-4098, which consists of carport structure construction, electrical construction, and roof construction. The base bid includes installation of a carport photovoltaic system, encompassing delegated design, fabrication, and erection of the carport structures, coordination with PECO electric for switchover, and associated site work with restoration. The base bid also includes repair of the library's asphalt shingle roof. An add alternate includes replacement of the asphalt shingle roof with a standing seam metal roof system, which includes structural reinforcement of the wood rafters and installation of a roof photovoltaic system. Drawings and specifications can be obtained electronically at no cost from the designated website. Bidders are required to supply their own equipment for site viewing and adhere to all requirements regarding bid guaranty, performance and maintenance bonds, and applicable labor and wage regulations. The awarded contractor must comply with Energy Efficiency and Conservation Block Grant, Montco 2040 Implementation Grant Program, Build American, Buy America Act requirements, and register in the federal System for Award Management. Bid Result Roofing - Pro Com Roofing - $599691 Electrical - TerraSol Energies, Inc. - $332666

Bid Results

Library

$932,357.00

Public - City

New Construction, Site Work

45

31

4

7

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

130 Overbrook Pkwy, Penn Wynne, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.