BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Site work for a development in New Waverly, Texas. Completed plans call for site work for a development.

Design-build construction services for trail hardening and related drainage and structural improvements along the Lake Loop section of the Multi-Use Trail in the Sam Houston National Forest. Work includes providing all labor, materials, equipment, supplies, supervision, and construction activities necessary to complete the project in accordance with the Statement of Work. Architect-Engineer services, if needed, are incidental to construction and not procured under the Brooks Act. The effort will be performed under a single firm-fixed-price contract set aside for small business concerns under NAICS 237990. This procurement is set aside 100 percent for Small Business concerns. The applicable NAICS code is 237990 - Other Heavy and Civil Engineering Construction. Project Description The project consists of trail hardening, drainage improvements, and maintenance of existing trail structures on the Lake Loop Section of the Multi-Use Trail within the Sam Houston National Forest. Work includes, but is not limited to: o Surface blading and shaping for proper drainage o Spot placement of aggregate base and oversized rock o Installation, maintenance, or removal of drainage structures including culverts and drainage dips o Trail mowing, clearing, and corridor maintenance o Seeding and fertilization of disturbed areas o Maintenance and repair of miscellaneous trail structures, including concrete planked crossings and FRP bridge decking All work shall be performed in accordance with the Statement of Work, applicable Forest Service specifications, and FP-14 requirements.

GC Bidding

Conservation and Development

$500,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
215
Bidding Soon
3,178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

June 23, 2026

Project location map

4 FM 1375, New Waverly, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.