BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 19, 2026

Site work and paving for a road / highway in Barre Town, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Please contact Town Engineer and Director of Public Works Josh Martineau at (802) 479-2595 or email jmartineau@barretown.org with any questions. The Town of Barre is seeking bids for road line painting. The contract includes 84,030 feet of double yellow center lines, 96,030 feet of white edge lines and 1,300 feet of dashed white line. Road lines will be applied in conformance with the latest version of the "Manual of Uniform Traffic Control Devices" (MUTCD) or as closely to the MUTCD as is possible as interpreted by the Town. The lists of roads to be painted is attached. Materials: The contractor shall use chlorinated low VOC traffic paint and glass beads or VT AOT specified traffic paint. Please mark on the Bid Form what paint will be used. Paint shall be applied at 15 mils. Glass beads shall be applied at 6 pounds per gallon. Application shall comply with Vermont AOT standards. Equipment: The contractor shall furnish a self-propelled fully automated pavement marking vehicle designed for this purpose and capable of applying markings in a true line and of even consistency with a minimum of spillage and overspray. The contractor shall furnish qualified operators and will be responsible for all movement of the equipment. The equipment shall be fully maintained and in good condition at all times throughout the work. All other equipment incidental for performance of the described work must also be supplied by the contractor. Line Location: On new pavement the Town shall mark the location of center and edge lines, and the contractor shall paint the lines as marked. Method of Measurement: The quantity for payment will be the actual number of linear feet of acceptable pavement markings applied to the described streets/highways and as directed by the Town. Double yellow lines for center lines will be measured as a single line, meaning the linear foot bid will account for both lines. The contractor shall bill the quantities provided by the Town, unless the contractor disputes a measurement. If the contractor questions a length provided by the Town, the contractor shall notify the Town and an attempt will be made to confirm the measurement. Basis For Payment: The unit price bid per linear foot shall include the cost of furnishing all of the labor, equipment, equipment maintenance, and materials necessary to accomplish the described work. Completion: The contractor must complete all work on or before June 30, 2026.

Sub-Bidding

Roads / Highways

$45,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
128
Bidding Soon
861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

Multiple Locations, Barre Town, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.