BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Site work and paving for a bridge / tunnel in Ithaca, New York. Completed plans call for site work for a bridge / tunnel.

The project involves culvert replacement and stream stabilization work on Bostwick Road in the Town of Enfield, as shown in drawings prepared by Tioga County Soil and Water Conservation District. A Type 2 concrete box culvert from Jefferson Concrete Corp was purchased by the Town of Enfield for this project. Refer to the bid item schedule for a list of tasks/items included in this RFP. Bidders will be furnished with a full and complete copy of the drawings and specifications upon proper presentation of the name and mailing address, telephone numbers, and emails of the interested party. Partial sets of the bidding documents will not be issued. The Town of Enfield does not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of documents. Plan Holders List not available. Deadline for Final Submission of Questions: February 27th 2026 4:30PM - All questions may be submitted in written form to: Angel Hinickle Tompkins County Soil and Water Conservation District 170 Bostwick Road Ithaca, NY 14850 or ahinickle@tompkins-co.org Doc.Note- Bidders will be furnished a full and complete copy of the drawings and specifications upon proper presentation of:1.) The name and mailing address, telephone numbers and emails of the interested party making such request; 1.) Contractor will be responsible for mobilization of equipment and necessary material to site and demobilization from site. 2.) Dewatering of the work area will be conducted via methods shown on the plans and instructions by Owner's representative. 3.) A 200' medium stone rip rap and 95' stacked rock walls will be constructed upstream according to the SITE PLAN and built according to the SPECIFICATIONS DOCUMENT. 4.) Removal of the old culverts and installation of the new concrete box culvert, which consists of excavating bridge to subgrade, place stone bedding, installing bridge, toe walls, and wing walls, and backfill structure to road subgrade according to the SITE PLAN and built according to the Project Plans and SPECIFICATIONS DOCUMENT. 5.) A 50' heavy stone riffle will be constructed at the outlet as well as a 50' stacked rock wall and a 65' medium stone rip rap wall according to the Project Plans and SPECIFICATIONS DOCUMENT. 6.) A Cross-Vane and J-Hool will be constructed downstream of the outlet according to the Project Plans and SPECIFICATIONS DOCUMENT. 7.) Seeding and mulching of the site must be accomplished within 24 hours after completion of sitework, and trench planting willows must be done. 8.) Operations will commence in the following sequence: Refer to Sheet #2 for proposed construction sequence and the included Construction Schedule and Construction Responsibility Chart.

Bid Results

Bridges / Tunnels

$351,300.00

Public - City

Paving, Site Work

29

8

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
84
Bidding Soon
1,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

June 1, 2026

Project location map

1074 Bostwick Rd, Ithaca, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.