BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2026 at 7:00 PM

Updated February 16, 2026

Site work and paving for a mixed-use development in Waupun, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The work includes approximately 800 linear feet of 8-inch PVC water main, 800 linear feet of storm sewer (12- to 30-inch diameter) and associated storm structure work, 11,500 square yards of aggregate base installation, 9,500 square yards of asphalt pavement, 12,000 square feet of concrete sidewalk, 5,000 linear feet of concrete curb and gutter, 1,000 square feet of concrete driveway approach, 9,000 square yards of topsoil and seeding, and all related work including unclassified excavation, erosion control, traffic control, and pavement markings. Bids must be submitted electronically via QuestCDN.com. No proposal will be accepted unless accompanied by bid security payable to the Owner in an amount of 5% of the Bidder's maximum bid price, in the form of a certified check or electronic bid bond issued by a surety meeting the requirements. No bidder may withdraw their bid within 60 days after the opening of bids. The minimum wages to be paid on the project are set according to local wage rates. The Work will be substantially completed on or before October 2, 2026 ; Final completion-June 1, 2027 Question Deadline 02/19/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services, Inc, Jason Laue, PE, (920) 392-5136, JLaue@msa-ps.com . Questions received less than seven days prior to the date for opening of Bids may not be answered. A. In general, the work consists of urban street and utility construction including water mainline and services, storm sewer, street pavement and curb/gutter, concrete sidewalk, and driveway apron replacement, site restoration and all related structures and work. B. The work is described in detail by the plan sheets titled: Shaler Drive Extension Project, City of Waupun, DodgeCounty, Wisconsin and the associated contract documents, including specifications, contained herein. C. The construction consists of supplying all materials, equipment, labor, etc. to supply a complete working system.

GC Bidding

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

50

15

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
200
Bidding Soon
1,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

Shaler Dr, Waupun, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.